After the footer was poured we had Sullivan Water Wells drill our well.
 This is all three rigs at the start of the drill.
 The main rig starting the process.
 Well drilling is a suspenceful bisnuss.
 Mr. Sullivan preparing to weld a joint.

Brian preparing a 20 foot section.
 Putting in another 20 foot lenth.
Bedrock!!
Water!!