Putting in the floor joists between the second and third bents. |
![]() |
Inserting one of the main beams. Josh in the blue hard hat. Brian off to right. |
![]() |
Another main beam. This one has a knee brace. Jesse top. Jonathan bottom. |
![]() |
Placing a beam on a spline. Ed the director top. Brian bottom. |
![]() |
Brian putting in the hand rail between the second and third bents. |
![]() |
And Jonathan on the other side. |
![]() |
Jonathan walking the straight and narrow. |