Raising the Frame

 The first bent is prepared to be lifted into place with a crane.
 The second bent is set into place.
 The connecting girds and braces are lifted into place.
 Brian watching the progress.
 Ed and Jessie use the beetle to tap a spline into place.
 The upper loft floor joist about to be lifted into place.
 Aaron and Sean ready the roof purlins.