After the foundation is excavated we went right to work building the footer.
 This is the North West corner.
 Brian leveling the footer with a water level.
 The footer is four foot wide at the North end of the 
foundation because it is a retaining wall.
 Sean using a "Yankee twister" tool to tie the rebar together with wire.