After the foundation is excavated we went right to work building the footer.
| This is the North West corner. |
| Brian leveling the footer with a water level. |
| The footer is four foot wide at the North end of the foundation because it is a retaining wall. |
| Sean using a "Yankee twister" tool to tie the rebar together with wire. |