Assembling the Bents
 |
The bents are assembled on the first floor deck. |
 |
Jessie assembling a bent. |
 |
Ed and Sean moving a post into place. |
 |
Sean chamfers the ends of the floor joists in preparing the timber
for assembly. |
 |
Aaron widens a recess for a strap tie on a principal rafter. |
 |
Peter cleans up the tongue and fork joint that tie the rafters at
the peak. |
 |
Three of the four bents assembled and ready to be raised. |
The frame was was carefully designed and the beautiful jointery work
was done by TimberCraft Homes in
Port Townsend, Washington.